Group results Written evaluation | 1\The first step in the construction process is the laying of fondations. |
2\Depending on the streng of the ground, different types of foundation can be used. |
3\Where poor ground conditions are prevalent, piled foundations will be typically used. |
4\This technique enables loads from the structure to be transferred to competent ground strata. |
5\Steel bearing piles are driven into the ground to a depth determined from the site investigation and the design calculations. |
6\Pile caps and ground beams are used to transfer the loads from the structure to the ground. |
7\Where lower loads required or better ground conditions are prevalent then pad or strip foundations may be used. |
8\These comprise of a reinforced concrete pad that distributes the loading from the structure to a level that can be resisted by the ground. |
9\Steel holding down bolts are cast into the concrete foundations ready to accept the factory made steel components |